You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Breakwater di Sisi Timur Laut Pulau Untung Jawa Rampung
.
photo Suparni - Beritajakarta.id

Breakwater Repair Work in Northeast Side of Untung Jawa Island Completed

Thousand Islands Water Resources (SDA) Sub-agency completed breakwater repair in the northeast side of Untung Jawa Island, Untung Jawa Island Urban Village, South Thousand Islands Sub-district.

We rearrange 249 tetrapods thus it can withstand the waves well

Thousand Islands SDA Sub-agency Head, Hendri conveyed, in this repair, his side rearranged the disordered tetrapods along more than 600 meters because of wave.

"We rearrange 249 tetrapods thus it can withstand the waves well. This work has been started since last week and completed yesterday," he mentioned, Friday (7/2).

Breakwater Repair Work on East Side of Karya Island Has Reached 80 Percent

In this breakwater repair work, his side deployed 14 personnel as well as raft and one heavy equipment ship unit.

"After rearranging tetrapods, we hope it can be stronger to hold high waves and prevent abrasion," he conveyed.

Linked News
Popular News indeks
  1. Deputy Gov Rano: Meat Stocks Secured Up to Ramadhan

    access_time22-02-2025 remove_red_eye553 personBudhi Firmansyah Surapati
  2. Jakarta to Hold Cheap Food Bazaar at 193 Locations

    access_time22-02-2025 remove_red_eye445 personBudhi Firmansyah Surapati
  3. Pramono - Rano Expected to Realize Better Resident Welfare

    access_time20-02-2025 remove_red_eye309 personBudhi Firmansyah Surapati
  4. Jakartans Invited to Participate in HPSN 2025 Event

    access_time21-02-2025 remove_red_eye301 personAldi Geri Lumban Tobing
  5. 41 Wild Cats in Cikoko Sterilized

    access_time21-02-2025 remove_red_eye295 personTiyo Surya Sakti