You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Breakwater di Sisi Timur Laut Pulau Untung Jawa Rampung

Breakwater Repair Work in Northeast Side of Untung Jawa Island Completed

Thousand Islands Water Resources (SDA) Sub-agency completed breakwater repair in the northeast side of Untung Jawa Island, Untung Jawa Island Urban Village, South Thousand Islands Sub-district.

We rearrange 249 tetrapods thus it can withstand the waves well

Thousand Islands SDA Sub-agency Head, Hendri conveyed, in this repair, his side rearranged the disordered tetrapods along more than 600 meters because of wave.

"We rearrange 249 tetrapods thus it can withstand the waves well. This work has been started since last week and completed yesterday," he mentioned, Friday (7/2).

Breakwater Repair Work on East Side of Karya Island Has Reached 80 Percent

In this breakwater repair work, his side deployed 14 personnel as well as raft and one heavy equipment ship unit.

"After rearranging tetrapods, we hope it can be stronger to hold high waves and prevent abrasion," he conveyed.

Linked News
Popular News indeks
  1. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye939 personAldi Geri Lumban Tobing
  2. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye828 personAldi Geri Lumban Tobing
  3. JIF Summit 2026 Drives Global Partnerships and Investment Growth in Jakarta

    access_time28-08-2026 remove_red_eye653 personAldi Geri Lumban Tobing
  4. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye517 personAldi Geri Lumban Tobing
  5. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye509 personAldi Geri Lumban Tobing